Sunday, March 27, 2011

Bathroom Kitchen Remodeling & Modular Home Construction-Florida Process Involved


Installing the website and building the building blocks

Install temporary power and also have electricity connected. Formulate site, install batter boards, dig foundation trenches and install the building blocks forms. Pour footings, build foundation walls and piers, and install mud sills. Possess the foundation inspected.

Setting House Units

Work crews lift components by crane to the foundation.

Roofing

Install knee boards, collar ties and rafter supports. Install gable end walls, structure wood and supports. Install roof vents. Install roof underlayment and shingles on hinge rows. Install ridge cap shingles.

Dormers

If applicable, eliminate roof, install dormer walls, trusses, roof decking, roof edge, tar paper, roll roofing in valleys, install shingles, metal flashing on front wall, install windows and finished trim.

Exterior Complete installing of exterior siding and trim, soffit and fascia. install windows in gable ends. Paint exterior doors and door jambs. Install shutters and optional exterior storm/security doors.

Complete Plumbing, Wiring and Utility Hookups

Install any under floor mechanicals, under floor plumbing and electrical work. Complete electrical hookup throughout home. inspect pipelines below or with the foundation. Provide plumbing connections for water and heater throughout home. Install exterior water faucets. Cut dryer vents through floor and also the outside of the home. Inspection of plumbing and wiring. Provide electrical service from electric company. Have electric, gas and water utilities switched on.

Cooling and heating

Install hvac systems. Inspection of hvac systems.

Steps, Porches, Decks, Driveways and Sidewalks

Install steps, porches, decks, driveways and sidewalks where applicable.

Interior finish interior wall and ceiling dry wall repairs and painting. Complete installing of archway and casing. Install stairway walls, drywall, and stair rails to second floor and paint, where applicable. Finish flooring, carpet to carpet splice, carpet to tile splice. Finish installing interior doors and trim. Finish installing light fixures and fans. Finish installing shower doors, appliances and accessories.

Completion cleanup of site outside and clean inside. Provide grading and seeding of disturbed land areas. Possess the final inspection and secure certificate of occupancy. Relocate.